Today is the big day that the Summerhouse was delivered.
After 18 months of planning; cutting a shed; moving a shed; mixing countless bags of sand and cement to concrete a sub base; then buying another shed; the replacing and repairing the boundarys; and finally laying slabs to level the foundation, we finally got there.
Recapping in pictures what has been going on:-
The second shed in situ between the trees. |
Laying the slabs |
Looking like a dance floor |
Thinning the Birches |
Finally ready to build. |
I still have a few plans: I have several boxes of white tiles from the previous owner in the shed that could be smashed up to make a Barcelona-like broken tile mosaic trim for the front of the base. The Summerhouse has partial glass sides so I'd like to reposition that large trellis panel and plant and train a honeysuckle so that there is something nice to look out on instead of the fence panels.
In the next few days the Summerhouse will go up. Watch this space!
No comments:
Post a Comment